We are only moving data model to the production as of now and the data load will be done later.
Hence inits are not being done. Please provide some info on below:
- Since there are 4 standard extractors with delta loads in production, we need to add 2 plants for all of these without disturbing the current delta. ---> For this, shall proceed as per the above - Create another init infopackage with new selection of 2 plants.
- We need to run full loads to load data for these plants before doing inits. The existing flows in production should not be impacted. Also production will not be in isolation for setup tables ---> Please suggest how to fill setup tables with posting on, only for these 2 plants. Does Early delta init help? If so, please guide