Hi Ann,
Thank you for the info.
I am having doubt on "Include Reservations" check box. If this check box is activated, the system will consider the MANUAL reservations (RESB-RSSTA = M & RESB-BDART = MR) which were created in MB21 for the particular material. By enabling this this check box, system will NOT consider the other requirement types (ie, RESB-BDART = AR, RESB-BDART = BB, RESB-BDART = SB). Am i right?
AR - OrderRes - Dependent reservation
BB - SubcReqmt - Subcontractor requirements of material provided to vendor
SB - DependReq - Dependent requirement
Q2: If set the value "X- Include All Reservations" in the field "Include Dependent Reservations", the reservations of type AR will be ONLY considered & reservations of type MR,BB & SB will NOT be considered. Am i right?
OPJJ screen shot below: