How to settle from AUC to Desired Cost Center?

$
0
0

Hi ALL,

 

I am facing below issue while settling AUC(KO88)

 

We are using investment management accounting through internal order

 

The main requirement is user want to bring back the costs to cost center  which are already capitalized against AUC assets.

 

All you know that at the time of internal order settlement against AUC, we can use distribution rule(KOB5) where v can maintain

desired receivers according to our requirement based on some percentages.

 

But the same when I am trying to settle from AUC to cost center, I assigned cost element in asset class(AUC) for bring back to OPEX.

 

I am able to give my desired cost center as receiver object  in distribution rule(KOB5),but system is asking for cost object for assigned

cost element which was assigned in asset class(AUC).

 

If I maintain default object for this assigned cost element in asset class system is allowing to post transaction.

 

Kindly suggest any one how to bring back capitalized  costs to desired cost center instead of default object?

 

 

Regards,

Ravan