Quantcast
Viewing all articles
Browse latest Browse all 9190

Re: Availability check for 3rd party Equipment

Hello

 

(1)  If I create 8 user status for my equipment (S001--> 1st Hr, S002-- > 2 nd Hr....etc), which status will be read by the user Exit IWO10009 and when ? means What logic would be applied at the time of selecting the particular status ?

 

Answer:When you use the Equipment in one work order you know how many hours required so you will select that status initially e.g. 1 hour.Now No. of hours remaining 7 and second time you are using the same equipment in other work order after finishing first order.The equipment have status for 1 Hour then User Exit will come in to picture will call the code and read the user status of equipment in Object list of Work order and give you pop up message for remaining hours as 7 hours.

 

(2)  How system will read the total no. of Hours available , if available hours are more than 8 e.g. 2-3 days capacity is available in future?

Answer:This logic only valid for 8 hours there is no scope for 2-3 days capacity .My logic valid for 8 hours on daily basis no availability check for future dates.

 

(3)  Also since I need to do advance planning, with this Equipment, means need to check when it'll be available in future ,how can we get the exact dates on which these hours are available??

 

Answer: you can use the TC IH08 for availability check in which you have select the layout for user status will give status info with number of hours remaining.Exact date not possible at this logic as will run only on real time.

 

Collectively this logic only work at real time basis to cater the present availability of equipment.

 

 

Br

Rakesh


Viewing all articles
Browse latest Browse all 9190

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>