Hello Mohammad, try that steps before togo to managed system setup:
1.- Update system info in solution manager SLD from managed system RZ70
2.- Once you have updated the system information in SLD, then wait some minutes until the data is replicated to Solution Manager LMDB
3.- Finish LMDB setup for that system, you have to check values on technical system and create a product system until you can finish Verification tool without any error log.
4.- After that assign your product system to a logical component, if you are on SP10 you can do that on LMDB if your are on a lower SP you need to do that from SMSY.
5.- Go back to Managed system setup and re-do all steps.
Hope that can help you.
Regards,
Luis